Spezial Engineering
Designing construction projects, shaping the future, our passion!
Infinity-Pool
Project description
This construction project required creative thinking due to the inadequate load-bearing capacity of the ceiling. We found a solution that made it possible to complete the project by using a steel girder grid with minimal deflection to transfer the resulting loads to the side walls of the building via catch beams.
Technical specifications:
Exavation: 1900 m³
Cast-in-place concrete: 1900 m³
Reinforcing steel: 120’000 Kg