Reactor facilities

Executed in 2011/2012
Customer: VSL

Description of project

We were commissioned by VSL to produce static calculations as well as production plans, including lists of materials, for a lifting framework (nuclear generator), which was constructed specially for the replacement of the generator (inspection).

Technical details

  • Steel weight: 150t
  • Generator: 470t
  • Scalability of project

This installation is one of a total of ten lifting frameworks that were produced in the period to 2016 based on our execution planning.